Ruth cooking lunch & Adam with grandchild


Donkeys bringing bricks to worksite


The Shikuku family and Pollock family

Today was the start of work for group four. We began the day early and were off the compound by 7am. Once we arrived at the job site there was plenty for us to do. We formed teams and Tom and Dave began working on the tie beams in building one. The rest of us worked on grating the floors to prepare for pouring of the concrete, as well as other small jobs that needed to done before we could move on. We are still waiting for the door frames for within the building but were able to set two doors in place for the kitchen building. Overall a very productive first day and I am happy to be apart of this wonderful team full of family.